Required Resources
|
Helpful References
|
Activity
#3 #4 #10 #19 #20 #21 #27 #28 |
File
a03.wmv (22MB) a04.wmv (32MB) a10.xlsx a19.mp4 (8MB) a20.wmv (4MB) a21.xlsm a27.mp4 VISSIM 5 a27.mp4 VISSIM 6 network01.zip network02.zip network03.zip network04.zip network05.zip network06.zip VISSIM tutorial |
Activity
#32 #33 #34 #35 #36 #41 #42 #47 #48 #49 #54, #55 |
Note: The networkxx.zip files (Activity #28) have been updated to run with VISSIM v6 and v7.
Videos are also available on Vimeo.
Errata
Activity
Location Error |
Chapter 3 #13 (page 95): Phasing, Rings, and Barriers
Figure 68 Overlap C and D are swapped, shown with the wrong parent phase |
Activity
Location Error |
Chapter 4 #22: Constructing a Traffic Control Process Diagram
Page 128, Task 1, third line Should read: "time begins at t=0" and not "t=3". |
Activity
Location Error |
Chapter 7 #43: Setting the Maximum Green Timing Parameter for All Approaches of an IntersectionTask 2 and Task 3
Simulation run time should be "3600 seconds", not "3900 seconds". |
Activity
Location Error |
Chapter 9 #56 (page 303): Determining Vehicle Change and Clearance IntervalsTask 2, second bullet
Should read, "...10 time steps per second" not "1 time step per second". |
Activity
Location Error |
Chapter 3, #13 (page 95): Phasing, Rings, and BarriersFigure 66
The two northbound exit lanes actually consist of two through lanes and a merge lane for the right turn traffic (movement 14). This allows movement 14 to be served during the entire cycle. |